 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Sat Feb 01, 2020 8:56 pm 
Offline

Joined: Sun Jul 21, 2013 12:00 am
Posts: 114
Location: Los Angeles
One more, not CEC, but definitely notable. The City of Pasadena has just opened a site with 20 CCS/Chademo 50kw chargers and 24 Superchargers. It is supposed to be the largest DCFC site in the US. Now we're talking.

https://www.plugshare.com/location/38377

_________________
2014 RAV4 EV - Shoreline Blue


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Sat Feb 01, 2020 10:07 pm 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1839
Location: Los Altos, CA
asavage wrote:
miimura wrote:


Per PlugShare:
  • DCFC: $0.10/kWh + $0.25/Min
  • L2: $0.20/kWh + $0.55/Min

.55/min for L2? Holy crap!

You are mistaken. The ChargePoint app shows the following:

DCFC: $0.25/kwh + $0.10/min
L2: $0.20/kWh + $0.55/hour

When I looked at the Plugshare this morning there was no price info. I added the above fees.

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Sun Feb 02, 2020 1:14 pm 
Offline

Joined: Mon Aug 07, 2017 4:55 pm
Posts: 208
Location: Duvall, Wash.
The above was a cut-n-paste from the PlugShare app, so it's the PlugShare app that's got it wrong.
[later]
It is, however, correct today :) Whew!

_________________
Regards,
Al Savage
2014 Rav4 EV, Shoreline Blue Pearl, #2609, first use 04Jun2014, 49k miles (Aug2017), OpenEVSE 40A. First DU replacement May2018 59k.
2018 Model 3 LR AWD, blue. 9.6kw solar
1999 E300 on B100 (sold Sep2018)
http://nissandiesel.dyndns.org


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Thu Feb 06, 2020 12:02 am 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1839
Location: Los Altos, CA
geo wrote:
Looks like the EA site in Willows along I-5 has finally gone live. This closes the last big gap on the way up to Oregon and beyond.

https://www.plugshare.com/location/180129

The CEC funded EVgo site at the Black Bear Diner in Willows, CA is also open now. Two 50kW BTC Slim chargers, just like the ones installed in Williams, CA.

Plugshare - Black Bear Diner, Willows, CA

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Last edited by miimura on Thu Feb 06, 2020 12:13 am, edited 1 time in total.

Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Thu Feb 06, 2020 12:11 am 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1839
Location: Los Altos, CA
The CEC funded EVgo site in Woodland also opened last month.

Plugshare - County Fair Fashion Mall, Woodland, CA

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Thu Feb 13, 2020 1:16 am 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1839
Location: Los Altos, CA
The CEC funded ChargePoint site in Lakehead-Lakeshore is finally active in the ChargePoint app. This is the final site to open along the I-5 corridor in ChargePoint's 15-601 CEC grant.

Plugshare - Basshole Brews, Lakehead-Lakeshore, CA

In the 15-601 grant, EVgo still has 3 more sites to open (3 completed) and EV Connect still has 8 more to open (3 completed). Recargo failed to open any of their 15-601 sites along the 101 corridor before they were issued a stop-work order by the CEC for non-performance.

There are many more CEC funded sites coming that were part of the later 15-603 grant. In that grant group, Chargepoint has completed 19 sites and has 34 more sites remaining.

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Tue Mar 31, 2020 12:53 am 
Offline

Joined: Sun Jul 21, 2013 12:00 am
Posts: 114
Location: Los Angeles
The Electrify America site in Barstow looks like it might be open. The EA site has marked it as live and it is also live on Plugshare. Usually EA posts to Plugshare as well, but that hasn't happened. Surprised any progress is being made, considering the current situation.

https://www.plugshare.com/location/186195

If this is actually open, then Las Vegas is now a very easy trip (once we're free to move around again).

_________________
2014 RAV4 EV - Shoreline Blue


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Wed Apr 01, 2020 6:41 am 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1839
Location: Los Altos, CA
geo wrote:
The Electrify America site in Barstow looks like it might be open. The EA site has marked it as live and it is also live on Plugshare. Usually EA posts to Plugshare as well, but that hasn't happened. Surprised any progress is being made, considering the current situation.

https://www.plugshare.com/location/186195

If this is actually open, then Las Vegas is now a very easy trip (once we're free to move around again).

Today, March 31, 2020, EA posted on the Plugshare listing that it is open.

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Wed Apr 01, 2020 7:13 am 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1839
Location: Los Altos, CA
The CEC funded EVgo site in Orland is now open. Four 50kW dual standard chargers and a dual 7.2kW L2 station.

Plugshare - Berry Patch Restaurant, Orland, CA

The CEC funded EVgo site in Yuba City is also open. Two 50kW dual standard chargers and a dual 7.2kW L2 station.

Plugshare - PetsMart Center, Yuba City, CA

This leaves only one more EVgo site left in their CEC grant - Corning, CA

EVconnect is not so far along with their grant sites. However, they did open one more. Two dual standard DCFCs and a dual head L2 station. Plugshare indicates the CCS is 350kW and CHAdeMO is 50kW.

Plugshare - Love's Travel Stop, Ripon, CA

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Thu May 07, 2020 9:11 pm 
Offline

Joined: Sun Jul 21, 2013 12:00 am
Posts: 114
Location: Los Angeles
Looks like the Chargepoint site in Yermo along I-15 has finally gone live. The units had been installed almost 16 months before they got power.

https://www.plugshare.com/location/180082

With the addition of a few more non-CEC sites along I-15, the trip to Las Vegas is downright easy.

_________________
2014 RAV4 EV - Shoreline Blue


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 266 posts ]  Go to page Previous  1 ... 23, 24, 25, 26, 27  Next

All times are UTC [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
© Toyota Rav4 EV Forum - part of the MyElectricCarForums.com Group