geo wrote:
Looks like Electrify America has started work on two sites along 395 up to Mammoth - Bishop and Coso Junction. I love what EA is doing.
There's also a few key sites on Plugshare that have been mostly complete for months but still not open. Wheeler Ridge on I-5 at the base of the Grapevine and Yermo on I-15 come to mind. I suspect they're waiting for the power company to hook it all up. Frustrating.
It also looks like Electrify America has a chance to be the first to close the gap between Salinas and San Luis Obispo 101 too. They have a "coming soon" site in Greenfield. However, those Plugshare entries most likely come from EA's online map, not from actual evidence of construction. However, you never know, Envision Solar could drop their solar+battery+DCFC systems at the Camp Roberts rest stops at any time. I really have to wonder what is taking Recargo so long to get their sites going on the 101 corridor.