Toyota Rav4 EV Forum
http://www.myrav4ev.com/forum/

New California Corridor Fast Chargers Installed
http://www.myrav4ev.com/forum/viewtopic.php?f=2&t=1839
Page 30 of 30

Author:  miimura [ Sat Nov 28, 2020 1:16 am ]
Post subject:  Re: New California Corridor Fast Chargers Installed

ChargePoint opened another site at I-5 and CA-12 in Lodi. This is the last site on I-5 northbound until Sacramento.

Plugshare - Shell Flag City - Two 50kW DCFC and a L2 station.

Also on I-80 in Cisco Grove

Plugshare - Chevron Cisco Grove - Two 50kW DCFC and a L2 station.

Also South Lake Tahoe

Plugshare - The Crossing at Tahoe Valley - Two 62.5kW DCFC and a L2 station

CalTrans also opened another site at the Donner Pass Eastbound Rest Area.

Plugshare - Donner Pass Eastbound Rest Area - One 50kW DCFC

Author:  geo [ Mon Dec 14, 2020 4:09 pm ]
Post subject:  Re: New California Corridor Fast Chargers Installed

Noticing quite a few new chargers, thought I'd list them. A lot of these are on secondary highways, filing in a lot of gaps. The statewide network is getting pretty robust.

On the 14/395 corridor:

Two new installs in Mojave, adding to the existing EA station.
Chargepoint under install: https://www.plugshare.com/location/288895
EV Connect: https://www.plugshare.com/location/113668

Also a Chargepoint in Bradys starting install: https://www.plugshare.com/location/288239

Still waiting on something, anything in Mammoth Lakes.

An install started in Boron along Hwy 58 : https://www.plugshare.com/location/289103

Along 101 :

Noticed the site in Willits finally went live : https://www.plugshare.com/location/275074

Also an EA site in Soledad that fills another gap : https://www.plugshare.com/location/269589

Page 30 of 30 All times are UTC [ DST ]
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/