 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Tue Oct 30, 2018 5:52 pm 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1709
Location: Los Altos, CA
geo wrote:
miimura wrote:
Chargepoint seems to be making more progress installing their Express 200 dual standard fast chargers at their CEC sites.
Plugshare indicates that Weed, Shasta, and Dunsmuir are open on I-5, but only Weed shows up on the Chargepoint web site.

Plugshare - Comfort Inn, Weed, CA
Plugshare - Mt. Shasta Shopping Center, Mt. Shasta, CA
Plugshare - Dunsmuir Yaks, Dunsmuir, CA

Chargepoint still needs to complete Dunnigan and Red Bluff to make this corridor easily traversable in a RAV4 EV with JdeMO. Even those two cities are 95 miles apart.

Seems like some of these are Chargepoint's old 25kw CCS stations. Does that mean Chargepoint is going to upgrade their other 25kw stations between Redding and Sacramento? (i.e. Williams / Corning)

The Dunsmuir location has had a 24kW CCS station for a long time. However, it has a separate PlugShare pin at a different address (even though they both reference the Yak's restaurant) and there is a new 50kW dual standard charger installed and pictured at the link I provided. So, all three I linked above are new 50kW dual standard units. ChargePoint Express 200 chargers made by Tritium to be specific.

The Yreka Carl's Jr. location has also been upgraded from 24kW CCS to 50kW dual standard. Comments indicate that the old 24kW charger has been taken offline.

ChargePoint did not get grants to upgrade Williams and Corning to 50kW. However, EVgo did get grants to place chargers at Orland, Willows, Williams, and Dunnigan. ChargePoint also has a Dunnigan location one exit up the highway from the EVgo site.

I am still updating the Google map that I made for these future charging sites and it indicates which ones are open.

Future DC Fast Charge Sites

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Sun Nov 25, 2018 8:56 pm 
Offline

Joined: Sun Jul 21, 2013 12:00 am
Posts: 66
Looks like Chargepoint has another one open - Red Bluff. The pictures seem to indicate 3 stalls total, though only one is currently working.

https://www.plugshare.com/location/60977

With the Electrify America location opening soon in Dunnigan, looks like the Oregon border will be possible along I-5.

Blythe also looks like it is open.

_________________
2014 RAV4 EV - Shoreline Blue


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Wed Nov 28, 2018 1:36 am 
Offline

Joined: Thu Jan 17, 2013 11:13 pm
Posts: 1709
Location: Los Altos, CA
geo wrote:
Looks like an EV Connect is about to go live in Blythe.

https://www.plugshare.com/location/168685

Sadly, it looks to be CCS only. I thought the CEC required both connectors? Or is this something else?

This station is now open. However, it is a single BTC 100 amp charger with CCS and CHAdeMO connectors. There is also a L2 station. It appears to be free at the moment.

_________________
2012 Shoreline Blue #1462 w/JdeMO | 2018 Tesla Model 3 LR | 4.32kW Motech/Enphase PV Solar + 2x Powerwall 2 AC| Leviton EVB40 40A & Jesla Home Charging | 2015 e-Golf LE (returned)


Top
 Profile  
 
 Post subject: Re: New California Corridor Fast Chargers Installed
PostPosted: Mon Dec 03, 2018 2:17 pm 
Offline

Joined: Wed Nov 14, 2012 9:50 pm
Posts: 3997
Location: San Diego
Attention JdeMO customers:

We were recently alerted us to a potential problem using JdeMO with CHAdeMO charge stations that are capable of over 125 amps / 50kW. There is a new one that just opened south of San Francisco, California USA (linked below) that can exceed that value.

If your JdeMO equipment was installed or updated between 1 Jan 2016 and 31 Dec 2018, your JdeMO equipment may charge faster than 125 amps / 50kW on these new high powered CHAdeMO chargers. This issue does NOT affect units before that time.

Thankfully, there is an manual remedy for this. Merely hold the green button WHILE CHARGING for 1 to 2 seconds and then release the button (holding for 3 seconds or more will stop the charge).

This will put the charger in a “half power” mode. Ensure that half power mode does not exceed 125 amps / 50kW before walking away from the vehicle.

Any time that you are using an unfamiliar charger, ensure that it does not exceed 125 amps / 50kW.

Any time that your JdeMO equipment is plugged into a charger, ensure that it does not exceed 125 amps / 50kW.

If you are in doubt as to the actual power going into the JdeMO, stop the charge immediately.

DANGER : Exceeding 125 amps / 50kW could result in property damage, fire, injury or death.

We will offer a complementary software update at our facility sometime in 2019. The updated software will not be ready before that future date in 2019.

That free update is in addition to our free low voltage wiring harness update, which you can have changed out at our shop or exchange it via FedEx / UPS / US Postal Service shipping companies.

Here is the link to the first CHAdeMO charger in the USA over 125 amps / 50kW.

Prunedale Shopping Center http://api.plugshare.com/view/location/163319


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 174 posts ]  Go to page Previous  1 ... 14, 15, 16, 17, 18

All times are UTC [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum

Search for:
cron
© Toyota Rav4 EV Forum - part of the MyElectricCarForums.com Group